Board of Water Supply. City Water Tunnel No. 1. Copper plate lining in tunnel. Brazing together of 5-by-12 foot copper plates. The mottled appearance of the copper plates at upper right was caused by hammering plates back against the concrete with a 2 pound steel hammer. June 8, 1916.