Board of Water Supply. City Water Tunnel No. 1. Engineers use a sunflower instrument to take cross section measurements during construction of City Water Tunnel No. 1. The sunflower instrument was devised and first utilized by the Aqueduct Commission during construction of the New Croton Aqueduct in the 1890s. March 14, 1913.