Board of Water Supply. City Water Tunnel No. 1. Tunnel end of 10-foot diameter steel interlining in drift part of tunnel diaphragm riveted to pipe. Track from south tunnel running into drift over top of riser pipe. Concrete has been placed around pipes in drift up to level of top of steel riser pipe. August 27, 1914.