Construction was begun on the Brooklyn-Battery Tunnel in 1940. Initially, Robert Moses had pushed for a bridge in the same place, but those plans were scrapped by the Dept. of War citing both security concerns (the bridge would be close to Brooklyn's Navy Yard) and citizen's outcry to preserve the Battery, which was largely undeveloped at the time (an unstated reason was Moses' feud with President Roosevelt.) Instead of a bridge, a tunnel was built to connect the two boroughs. Four towers ventilate the two-mile-long strip of underground highway, refreshing air every 90-seconds.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel
Post

Brooklyn approach to the Brooklyn-Battery Tunnel, 1950. Conceived in the late 1930s by city officials, this project was one that master planner Robert Moses was actually not a proponent (and complained about the resulting tunnel for decades). Moses wanted to construct a bridge between lower Manhattan and Brooklyn but city officials, including Mayor LaGuardia, and President Roosevelt advocated for the tunnel (with FDR citing issues of national security in the construction of a bridge as well as his dislike for Moses). Construction on the tunnel began in 1940, with FDR attending the groundbreaking ceremony, but was waylaid by World War II. Completed and opened to traffic in 1950 it is the longest continuous underwater road in North America. In 2010 it was renamed (officially, though not colloquially) the Hugh L. Carey Tunnel, for the former New York State Governor.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel
Post

The completion of the Brooklyn-Battery Tunnel in May, 1950 marked the end of 10 years of planning and engineering, overcoming back-breaking labor, war, and financial difficulty that stood in its way. At the time the nation’s longest most modern underwater vehicular tunnel, the Brooklyn-Battery tunnel had about as turbulent a history as any of New York’s infrastructure. It was the most expensive two-mile bit of highway ever built at the time - costing more than $40,000,000 a mile. A connection between Brooklyn and Manhattan was first conceived of in 1929. Initially, a graceful, double-unit suspension bridge was to connect the boroughs, featuring a ramp leading down to Governor's Island at the apex. Unfortunately, various groups objected against its potential to disfigure the Battery Park Landscape, and President FDR cited security concerns. In the end, the War Department barred the construction of the bridge in 1939. Funding dwindled on the endeavor to drill a two-mile tunnel between Battery Park and Brooklyn until the Reconstruction Finance Corporation offered $57,000,000 in loans towards its construction. Ground broke on October 28th, 1490, with President Franklin D. Roosevelt on hand for the momentous occasion. Major construction work began in 1941 and for nearly two years, it slowly marched forward. On the Manhattan end, a hole 24-feet in diameter was carved through solid rock which began 2,800 feet under the surface of the river. The Brooklyn side was challenged with softer rock to drill through at about 1,000 feet from the entrance at Hamilton Avenue and Van Brunt Street. The United States entry into World War II put an end to construction on the tunnel, leaving both materials and manpower becoming scarcer every day. In fact, progress on the tunnel came to a standstill towards the end of 1942. For three years the whole project lay idle, only the throne of pumps on the Brooklyn side signifying that the tunnel job was not forgotten. Things began humming again at the end of the war in 1945. Water was pumped out, concrete shields were removed, and men came back to work. It took another five years for the tunnel to be completed and acclaimed as a modern marvel. Fully illuminated, with fresh air exchanged every 90 seconds, the tunnel was opened with great fanfare.

Photos(37)

Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Ramp to Governor's Island from proposed Battery Bridge Reproduction/print of lithograph? Caption: "Proposed spiral ramp at Governors Island in new Brooklyn-Battery Bridge as filed in the appeal from War Department's rejection on the span;" portion of East River in foreground.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Comparative effect of bridge approach Two elevations: caption on recto below image: "Comparative effect of bridge approach and normal building development on adjacent buildings." Two sections near Battery Place: one with existing structures, one showing the proposed bridge approach.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0141, TRAN 0142), some of which may also be described in this new record; Three views of Brooklyn-Battery Tunnel construction. 0145 shows man laying tiles.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0141, TRAN 0142), some of which may also be described in this new record; Three views of Brooklyn-Battery Tunnel construction. 0145 shows man laying tiles.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0141, TRAN 0142), some of which may also be described in this new record; Three views of Brooklyn-Battery Tunnel construction. 0145 shows man laying tiles.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0123, TRAN 0122, TRAN 0121, TRAN 0127, TRAN 0126, TRAN 0125, TRAN 0124), some of which may also be described in this new record; Eight views of above-ground Brooklyn-Battery Tunnel construction. 0127 is a view of Governor's Island ventilation building.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0166, TRAN 0165), some of which may also be described in this new record; Three architectural renderings of the Brooklyn-Battery Tunnel Ventilation Building located on Battery Place.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel construction] Image represented is one of a related set (TRAN 0137, TRAN 0138, TRAN 0139), some of which may also be described in this new record; Four views of men working on underground Brooklyn-Battery Tunnel construction.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Right on the dot Caption: "Right on the dot--H. D. Bensel of Douglaston, one of the \[Brooklyn-Battery Tunnel] engineers who make sure both ends of a tunnel meet, sights through his 'gun' \[ a surveying instrument, such as a level, mounted on a tall tripod] for a checking point."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Brooklyn-Battery Tunnel Posed group of Brooklyn-Batttery Tunnel construction workmen.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Inspection of progress Image represented is one of a related set (TRAN 0132), some of which may also be described in this new record; Two similar images. Caption (0134): "Inspection of progress on the Brooklyn end of the Brooklyn-Battery Tunnel is made by Mayor O'Dwyer and other city officials. ... Shown with the mayor are George V. McLaughlin, Borough Works Commissioner John J. Lynch, Deputy Mayor John J. Bennett, and Robert Moses, president of the Triborough Bridge Authority."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Inspection of progress Image represented is one of a related set (TRAN 0132), some of which may also be described in this new record; Two similar images. Caption (0134): "Inspection of progress on the Brooklyn end of the Brooklyn-Battery Tunnel is made by Mayor O'Dwyer and other city officials. ... Shown with the mayor are George V. McLaughlin, Borough Works Commissioner John J. Lynch, Deputy Mayor John J. Bennett, and Robert Moses, president of the Triborough Bridge Authority."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Brooklyn-Battery Tunnel Image represented is one of a related set (TRAN 0152, TRAN 0153), some of which may also be described in this new record; Three views of the interior of Brooklyn-Battery Tunnel. Two of the images include automobiles and one includes front portion of bus with driver.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Almost finished Caption: "Almost finished--The nation's longest under-water tube, the Brooklyn-Battery Tunnel, will look like this to motorists when it opens next spring. ... This photo was taken near the Brooklyn end (background) of the east tunnel. At right is assistant engineer Frank Furrelle of Yonkers." Image includes moving truck in foreground.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Brooklyn-Battery Tunnel construction Interior view of Brooklyn-Battery Tunnel construction.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Brooklyn-Battery Tunnel Image represented is one of a related set (TRAN 0152, TRAN 0153), some of which may also be described in this new record; Three views of the interior of Brooklyn-Battery Tunnel. Two of the images include automobiles and one includes front portion of bus with driver.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Tedious work Caption: "Tedious work--The big job going on in the tunnel is lining it with miles of these little tiles. There will be about 8,100,000 separate pieces in all. Shown doing the work on one section are Tony Lyons, 703 2d Ave., Manhattan; Dominic Romeo, 54 1st Place, and Jacob Rado, 4810 28th Ave., Astoria."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Brooklyn-Battery Tunnel Image represented is one of a related set (TRAN 0152, TRAN 0153), some of which may also be described in this new record; Three views of the interior of Brooklyn-Battery Tunnel. Two of the images include automobiles and one includes front portion of bus with driver.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Battery Park, Governors Island, Brooklyn-Battery Tunnel Ventilation Building, and Brooklyn] Aerial view showing section of Battery Park in foreground and portions of East River, Governors Island, and Brooklyn and Brooklyn-Battery Tunnel Ventilation Building in background. The Brooklyn-Battery Tunnel runs under the East River between Battery Park and Brooklyn.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0157, TRAN 0160, TRAN 0158, TRAN 0159, TRAN 0181, TRAN 0128), some of which may also be described in this new record; Caption (0158): "General view showing Manhattan Plaza and blower and exhaust building \[i.e. Brooklyn-Battery Tunnel Ventilation Building on Battery Place] in Battery Park." 0158 and 0159 are aerial views; 0181 and 0183 are interior views.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel. Brooklyn approach.]
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0157, TRAN 0160, TRAN 0158, TRAN 0159, TRAN 0181, TRAN 0128), some of which may also be described in this new record; Caption (0158): "General view showing Manhattan Plaza and blower and exhaust building \[i.e. Brooklyn-Battery Tunnel Ventilation Building on Battery Place] in Battery Park." 0158 and 0159 are aerial views; 0181 and 0183 are interior views.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Firsters Image represented is one of a related set (TRAN 0175), some of which may also be described in this new record; Caption: "Firsters--Mrs. Mathilda S. Simmons, 78, and her brother, Charles W. LaRue, 82, both of 390 Rugby Road, walked with their father across the Brooklyn Bridge the day it was opened, 67 years ago. Yesterday, the day it was opened, they were driven by Mrs. Simmons' granddaughter, Mrs. Arline S. Brough of the Hotel St. George, through the Brooklyn-Battery Tunnel. They are shown paying the toll to \[African-American] Bert Smith of 397 Adelphi St., on completion of their crossing."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Firsters Image represented is one of a related set (TRAN 0175), some of which may also be described in this new record; Caption: "Firsters--Mrs. Mathilda S. Simmons, 78, and her brother, Charles W. LaRue, 82, both of 390 Rugby Road, walked with their father across the Brooklyn Bridge the day it was opened, 67 years ago. Yesterday, the day it was opened, they were driven by Mrs. Simmons' granddaughter, Mrs. Arline S. Brough of the Hotel St. George, through the Brooklyn-Battery Tunnel. They are shown paying the toll to \[African-American] Bert Smith of 397 Adelphi St., on completion of their crossing."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0157, TRAN 0160, TRAN 0158, TRAN 0159, TRAN 0181, TRAN 0128), some of which may also be described in this new record; Caption (0158): "General view showing Manhattan Plaza and blower and exhaust building \[i.e. Brooklyn-Battery Tunnel Ventilation Building on Battery Place] in Battery Park." 0158 and 0159 are aerial views; 0181 and 0183 are interior views.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0157, TRAN 0160, TRAN 0158, TRAN 0159, TRAN 0181, TRAN 0128), some of which may also be described in this new record; Caption (0158): "General view showing Manhattan Plaza and blower and exhaust building \[i.e. Brooklyn-Battery Tunnel Ventilation Building on Battery Place] in Battery Park." 0158 and 0159 are aerial views; 0181 and 0183 are interior views.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

\[Brooklyn-Battery Tunnel Ventilation Building] Image represented is one of a related set (TRAN 0157, TRAN 0160, TRAN 0158, TRAN 0159, TRAN 0181, TRAN 0128), some of which may also be described in this new record; Caption (0158): "General view showing Manhattan Plaza and blower and exhaust building \[i.e. Brooklyn-Battery Tunnel Ventilation Building on Battery Place] in Battery Park." 0158 and 0159 are aerial views; 0181 and 0183 are interior views.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Like washing 6,500 bathrooms Caption: "Like washing 6,500 bathrooms--This special tank ... clean\[s] 780,000 square feet of tile in Brooklyn-Battery Tunnel ..."
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Repairs required before opening Image represented is one of a related set (TRAN 0155), some of which may also be described in this new record; Caption (0155): "Repairs required before opening--Borough President Cashmore points to one of 52 shattered light panels in new Brooklyn-Battery Tunnel link as Edward Clarke, employee of Department of Highways and Sewers, removes glass particles from his ladder perch. Looking on at left is Chief Borough Engineer, Charles A. Riedel." 0156 is an enlarged close-up of Clarke in same image.
Brooklyn-Battery Tunnel image

Brooklyn-Battery Tunnel

Repairs required before opening Image represented is one of a related set (TRAN 0155), some of which may also be described in this new record; Caption (0155): "Repairs required before opening--Borough President Cashmore points to one of 52 shattered light panels in new Brooklyn-Battery Tunnel link as Edward Clarke, employee of Department of Highways and Sewers, removes glass particles from his ladder perch. Looking on at left is Chief Borough Engineer, Charles A. Riedel." 0156 is an enlarged close-up of Clarke in same image.