South of Union Square logo
South of Union Square
Place
200 Clinton Street

Posts & Stories(1)

Boring but Essential! image

Boring but Essential!
Story

When you’re planning to build some of the world’s most spectacular and challenging tunnels, you need to know ahead of time what you’ll be digging through. Is it soil, sand, or stone? Is the stone strong and secure or friable and likely to collapse? To know what the bedrock is like, you need a drill rig to dig it out from hundreds of feet below the surface. The drill extracts geological core borings, cylindrical samples that provide a cross-section of subsurface conditions and let engineers know whether the area is good for tunneling and what construction methods should be used. The drill bits are tubular and loaded with shot or embedded with diamonds to cut around the core, like a drinking straw plunging into a milkshake (except really, really hard!).

Photos(2)

200 Clinton Street image

200 Clinton Street

Board of Water Supply. City Water Tunnel No. 1. Geological test borings at southeast corner of Clinton Street and East Broadway. October 20, 1911.
200 Clinton Street image

200 Clinton Street

Clinton St. at East Broadway in Oct. 1911, during geological investigations for City Water Tunnel No. 1, and in Oct. 2022. 1911: Board of Water Supply 2022: Jean Schwarzwalder, DEP
Privacy PolicyTerms of Service