South of Union Square
Menu
Place
Share
401 West 123rd Street
Posts & Stories
(1)
Boring but Essential!
Story
When you’re planning to build some of the world’s most spectacular and challenging tunnels, you need to know ahead of time what you’ll be digging through. Is it soil, sand, or stone? Is the stone strong and secure or friable and likely to collapse? To know what the bedrock is like, you need a drill rig to dig it out from hundreds of feet below the surface. The drill extracts geological core borings, cylindrical samples that provide a cross-section of subsurface conditions and let engineers know whether the area is good for tunneling and what construction methods should be used. The drill bits are tubular and loaded with shot or embedded with diamonds to cut around the core, like a drinking straw plunging into a milkshake (except really, really hard!).
Photos
(3)
View fullscreen
401 West 123rd Street
Dewey Day Land Parade Admiral Dewey Parade with Grant's Tomb in the background; 123 St. Harlem
401 West 123rd Street
Board of Water Supply. City Water Tunnel No. 1. Shot drill in operation to collect geological core samples at 123rd Street and Morningside Avenue. October 13, 1909.
401 West 123rd Street
Board of Water Supply. City Water Tunnel No. 1. Geological test borings on west side of Morningside Avenue, south of 123rd Street. Showing Keystone rig. November 2, 1910.
Privacy Policy
Terms of Service
Open Map