South of Union Square
Menu
Place
Share
271-273 Broome Street
Posts & Stories
(1)
Boring but Essential!
Story
When you’re planning to build some of the world’s most spectacular and challenging tunnels, you need to know ahead of time what you’ll be digging through. Is it soil, sand, or stone? Is the stone strong and secure or friable and likely to collapse? To know what the bedrock is like, you need a drill rig to dig it out from hundreds of feet below the surface. The drill extracts geological core borings, cylindrical samples that provide a cross-section of subsurface conditions and let engineers know whether the area is good for tunneling and what construction methods should be used. The drill bits are tubular and loaded with shot or embedded with diamonds to cut around the core, like a drinking straw plunging into a milkshake (except really, really hard!).
Photos
(4)
View fullscreen
271-273 Broome Street
Board of Water Supply. City Water Tunnel No. 1. Geological test borings on southeast corner of Allen Street and Broome Street. Showing Keystone rig. September 26, 1910.
271-273 Broome Street
Board of Water Supply. City Water Tunnel No. 1. Geological test borings on Broome Street at Allen Street. Shoe store and grocery with garlic hanging in doorway. July 15, 1910.
271-273 Broome Street
Board of Water Supply. City Water Tunnel No. 1. Geological test borings on southeast corner of Allen Street and Broome Street. Showing Davis Calyx shot rig. October 8, 1910.
271-273 Broome Street
Board of Water Supply. City Water Tunnel No. 1. Geological test borings. Camera at northeast corner of Broome and Allen Streets, looking south. July 25, 1911.
Privacy Policy
Terms of Service
Open Map