Subsurface Restoration for Route 112 Section 2 on Chrystie Street Looking North: Chrystie Street Connection (NYCTA)
As part of the documentation of the construction of the Chrystie Street Connection (NYCTA), negative documents subsurface restoration for Route 112, Section 2 on Chrystie Street between Canal and Delancey Streets. Camera on west side of Chrystie Street looking north. Also shows storefronts, excavation, construction equipment, construction workers, barricades.